Fortis Roofing Farnborough 01252 596302 Get a quote

Roof replacement and new roofs in Farnborough

Stripped to the rafters and rebuilt, layer by layer

When repairs keep chasing leaks, we survey the whole roof, show you the photos and measurements, and price the strip, new underlay, battens and covering as one job.

Get a free quoteCall 01252 596302

  • Photos and measurements
    of your roof
  • One written
    price
  • Repairs, re-roofs
    and emergencies
  • 10-year workmanship
    guarantee

Find us on Google

Detached brick house with a new grey tile roof, a roofer small in frame near the ridge

When a roof is due for replacing

  • Slipped tiles on every slope, not one
  • Underlay torn or sagging between the rafters
  • Battens soft or snapping when lifted
  • Leaks returning after each new repair
  • Tiles flaking, crumbling or worn smooth

What a new roof can be covered in

White-clad dormer loft conversion on a tile roof

Concrete tile

HomeBuilding gives 40-50 years; Marley expects around 60.

Stack of new clay tiles on a scaffold board beside older tile and slate roofs

Clay tile

Fired clay, given a typical 60-80 years by HomeBuilding.

Ridge tile on a slate roof with its mortar bedding washed out

Natural slate

HomeBuilding: Welsh 100+ years, Spanish 75-100, reclaimed Welsh 50-80.

Re-roofing work we carry out

  • Full strip and re-tile
  • Re-slating
  • Flat roof replacement
  • Chimney repair and lead
  • Fascias, soffits and gutters
  • Insulation at rafter level

Repair, part re-roof or full replacement?

Repair

The faults sit in one place, and the battens and underlay are sound.

Part re-roof

One slope has failed while the others still have years left in them.

Replace

Coverings, battens and underlay are failing together across every slope.

Roof replacement by the figures

What the figures say about a new roof

Covering lifespans, insulation targets, the re-roofing test, fixing and ventilation standards, scaffold licences and the contract rules, each with its named source and what it changes about your new roof.

Chapters of this guide and the figure each one turns on
No.ChapterThe figure it turns on
01Choosing what goes back on the roofWelsh slate: 100+ years
02Insulation when the roof is stripped0.35 threshold, 0.16 target
03Building Regulations and planning for a re-roofUnder 25% of envelope, 50% of roof
04Strip, underlay, batten, cover: the work in orderBS 5534: ridge and hip mechanically fixed
05Scaffold, licences and a safe site10 working days' notice
06Contracts, neighbours and new-build cover14 days to cancel a home-signed contract

Chapter 01 of 06

Choosing what goes back on the roof

Typical working life of each covering for a new roof, in years

  • Welsh slate100+ years
  • Spanish slate75-100 years
  • Reclaimed Welsh slate50-80 yearsPart-used before it arrives
  • Clay tile60-80 years
  • Concrete tile40-50 years
  • Fibre cement tile30-40 years
Source: HomeBuilding (supply-only table), updated 30 September 2025. Typical ranges, never a promise.

A full replacement is the one point in a roof's life when the covering can change. Putting back what was there is the usual starting point, and on a listed home or in a conservation area it is often what the council expects, but the choice is open, and it sets how long the new roof should last. The bars give HomeBuilding's typical working life for six coverings found on houses across Farnborough, Aldershot, Fleet and Farnham.

Slate, clay or concrete

Natural slate leads the chart, though where it comes from matters. HomeBuilding gives Welsh slate 100+ years, Spanish natural slate 75-100 years and reclaimed Welsh slate 50-80 years, because reclaimed slate comes off an older roof with some of its life already spent. Clay tile is given 60-80 years, and Marley cites the BRE's 60-year minimum life expectancy for clay.

Concrete tile gets 40-50 years from HomeBuilding, while Marley's own figure for its tiles is around 60 years, which it is careful to call an expectation rather than a promise. Where two sources differ like this, both are worth knowing. Fibre cement tiles come lowest on the chart at 30-40 years.

Weight is the other half of the choice. On the Planning Portal's guidance, a new covering that weighs 15 per cent or more above the old one needs Building Regulations approval, with a structural engineer or surveyor looking at the roof first. Changing to a different covering therefore starts with a weight check, set out in chapter 03. Flat roofs on extensions and dormers have their own membranes and lifespans, covered on our flat roofing page.

Putting the old tiles back

Some roofs can be stripped and relaid with their own tiles or slates on new battens and underlay. That works when the covering itself is hard and sound and only the parts beneath have failed, and it leaves the look of the house unchanged. It works less well when a share of the tiles break on lifting or have worn thin, because the gaps then need matching tiles, and the original may no longer be made. Our answer on whether old roof tiles can be reused sets out how that call is made.

A lifespan is a typical range from a national guide, never a promise for one roof. Workmanship, ventilation and upkeep push a roof towards the top or the bottom of its range, and a roof in a sheltered garden can age differently from one facing open ground. The parts under the covering, the battens, underlay and fixings, are what a re-roof renews in every case, whatever goes on top.

Chapter 02 of 06

Insulation when the roof is stripped

Approved Document L figures for a renovated roof, U-values in W/m²K

  • 0.35U-value above which a renovated roof is upgraded
  • 0.16the U-value Table 4.3 asks the upgrade to reach
  • 15 yearssimple payback limit in paragraph 4.13
  • 24 March 2027the 2026 edition of AD L takes effect
Source: Approved Document L, Volume 1, 2021 edition incorporating 2023 amendments, and the 2026 edition; accessed 28 October 2026

Stripping a roof back to its rafters opens up the layers that keep heat in the house, and the Building Regulations treat that as a chance to improve them. The panel gives the Approved Document L figures for a roof that is renovated rather than built new.

When a re-roof counts as renovation

The Building Regulations 2010 define renovation of a thermal element (a wall, floor or roof) as providing a new layer in it or replacing an existing layer. A re-roof replaces layers of the roof, which is why building control looks at insulation as part of the job and not only at the covering. Roof windows and rooflights sit outside that definition: the regulations exclude them from thermal elements, and they have their own figures.

Where the existing roof's U-value (the rate at which heat passes through it, in W/m²K) is worse than 0.35, Table 4.3 asks for it to be brought to 0.16. That is a demanding target on a roof with shallow rafters, and paragraph 4.13 allows for it. If reaching 0.16 cannot be done in practice, or the saving would take more than 15 years to repay the cost, the roof is improved as far as a 15-year payback allows. Generally, an upgraded element should not be left worse than 0.7.

Insulating at rafter or ceiling level

There are two places the insulation can go. In a cold loft it lies on the ceiling joists, the loft above stays cold, and the roof space is ventilated so moisture can leave. In a warm loft it follows the slope, between and over or under the rafters, so the loft sits inside the heated part of the house. A re-roof is the easiest moment to insulate at rafter level, because the rafters are open from above; once the tiles are back, the same job means working from inside the loft. Our guide to insulation when re-roofing compares the two routes.

Loft conversions use the same Table 4.3 figures, and on a dormer the window's own roof counts as part of the roof. These are the 2021 figures with the 2023 amendments. The 2026 edition of Approved Document L takes effect on 24 March 2027 for work in England, with the tables renumbered 3.2 and 3.3 and the payback rule moved to paragraph 3.14, so a roof contracted close to that date is checked against the edition that applies to it.

Adding insulation changes how moisture moves through the loft, so the underlay and the eaves ventilation are chosen with it, not afterwards. A loft that was fine with an old, draughty roof can start to show condensation once the roof is sealed and insulated, which is why chapter 04 treats ventilation as part of the build rather than an extra.

Chapter 03 of 06

Building Regulations and planning for a re-roof

What a re-roof can bring in, and whose rule it is
Change on a re-roofWhat it brings inRule
Under 25 per cent of the envelope and under 50 per cent of the roof affectedNo building control application normally neededPlanning Portal
New covering 15 per cent or more heavierApproval, with a structural check firstPlanning Portal
New covering with significantly different fire performanceBuilding Regulations approvalPlanning Portal
Change of covering on a houseNormally permitted developmentGPDO Class C
Work on a listed home affecting its characterListed building consent as wellLBCA s7
Roof work on a flatNo permitted development rightsGPDO article 2
Source: Planning Portal re-roofing guidance; General Permitted Development Order 2015; Listed Buildings Act 1990 s7, via legislation.gov.uk; accessed 28 October 2026

A re-roof on a house normally needs no planning permission but does involve building control, and it helps to keep the two apart. The table sets out what each kind of change brings in and where the rule comes from.

Building control for a new roof

The Planning Portal's test is the one to work from: no building control application is normally needed where under 25 per cent of the total building envelope and under 50 per cent of the roof are affected. A full replacement goes well past the roof figure, so the work is notified to building control, either the council team or a registered building control approver, the private route under the registration rules in force from 6 April 2024. Our answer on the 25 per cent re-roofing rule unpacks the test.

Councils word their pages in their own way. Homes in Rushmoor and Hart, which takes in Farnborough, Aldershot and Fleet, are served by one team, the Hart and Rushmoor Building Control Partnership, working from Rushmoor's offices in Farnborough; it sets no re-roofing percentage of its own and refers people to the Planning Portal. Bracknell Forest Council and Basingstoke and Deane Borough Council each list re-covering pitched and flat roofs as work that may need approval, and RBWM's list includes re-tiling. For addresses in those areas we confirm the position with the council before work starts, and never assume it.

Planning, conservation areas and Article 4

On a house, a change of roof covering is normally permitted development under Class C of the General Permitted Development Order, so like-for-like work, or a different tile, needs no application. Three cases change that. Flats have no permitted development rights at all. A listed home keeps Class C but also needs listed building consent for any work affecting its character. And an Article 4 direction can withdraw permitted development in parts of some conservation areas: Rushmoor's Cargate direction in Aldershot covers chimneys and flues, Hart's 1998 directions bring frontage roof slopes and chimneys under control in most of its conservation areas, North Fleet aside, and Basingstoke and Deane expects Welsh slate and clay tiles to stay in place across four of its town-centre conservation areas.

Elsewhere, check whether an Article 4 direction applies with the council concerned before choosing a different covering. Rushmoor has nine conservation areas, with Farnborough Hill, St Michael's Abbey and South Farnborough among them, and we check every address against the council's map as part of the survey.

The covering is not the only thing planning can touch. A re-roof that raises the ridge, adds a dormer or changes the shape of a slope is no longer a re-covering, and it is assessed as an alteration in its own right, with its own drawings and checks.

Chapter 04 of 06

Strip, underlay, batten, cover: the work in order

The fixing and ventilation figures a new pitched roof is built to

  • BS 5534:2014+A2:2018current code of practice for slating and tiling
  • BS 8612:2018test specification for dry ridge, hip and verge
  • 25mmeaves ventilation, HR underlay, pitch 15° or less
  • 10mmeaves ventilation, HR underlay, pitch over 15°
Source: BSI Knowledge, accessed 28 October 2026; Marley guidance on BS 5534 fixing and BS 5250 cold-roof ventilation

A re-roof follows the same order on almost every house, and knowing it makes the time on site easier to follow. The figures in the panel are the standards the new layers are built to.

From scaffold to ridge

  1. Scaffold goes up with a working platform at the eaves and edge protection around the roof.
  2. The old covering, battens and underlay come off one section at a time, and the open area is sheeted against the weather at the end of each day.
  3. The rafters are checked. Soft or split timbers and rotten wall plates are repaired or replaced, and you see the photos before anything extra is agreed.
  4. New underlay is laid and lapped, then new battens are fixed at the spacing the chosen tile or slate needs.
  5. The covering goes on, with lead flashings, soakers and valleys renewed where the old ones are tired.
  6. Ridges, hips and verges are fixed, the fascias, soffits and gutters are finished, and the scaffold comes down after a final check.

Each slate, and every tile at the eaves, verges and ridge, is fixed rather than left to hang on its nibs. Since the 2014 revision of BS 5534, mortar on its own is no longer treated as enough to hold a ridge or hip tile, so each one is also screwed, clipped or wired. A dry-fix system is the alternative to a mortar bed, and BS 8612:2018 is the specification such systems are tested to. Marley points out that installing to BS 5534 isn't required by law. What the law asks, through Approved Document C, is for each tile to be fixed in an appropriate manner, and working to the code is the usual way of showing that.

Battens at the tile's gauge
New battens go on at the spacing the chosen tile or slate needs.

Underlay and loft ventilation

The underlay is the second line of defence, catching rain or snow that gets past the covering and leading it down to the gutter. It also changes how the loft breathes. Marley's guidance under BS 5250 sets eaves ventilation by underlay and pitch: where a cold roof has HR (non-breathable) underlay, 25mm along the eaves at 15° or less, and 10mm above that. With LR (breather) underlay and a well-sealed ceiling, the ordinary gaps left at the eaves may be all the airflow needed, provided the product carries third-party certification for that use. We choose the underlay and the eaves vents together, and our guide to what happens during a new roof walks through each stage.

Chimneys get their own attention while the scaffold is up. Loose flaunching (the mortar bed round the pots), open joints and tired lead are cheaper to put right now than from a second scaffold later. If the survey shows the roof is sound apart from one area, a roof repair is the better buy, and our pitched roofing page covers that route.

Chapter 05 of 06

Scaffold, licences and a safe site

Scaffold licences on the highway, by highway authority
Highway authorityCoversNoticeWho applies
Hampshire County CouncilRushmoor, Hart, East Hampshire, Basingstoke and DeaneTen clear working daysHampshire: scaffolding companies apply
Surrey County Council (until April 2027)Surrey Heath, Waverley, Guildford, WokingAt least 10 working daysNot stated: we arrange it with the scaffolder
Wokingham Borough CouncilIts own boroughAt least 10 working daysWokingham: scaffolding companies apply
Bracknell Forest CouncilIts own boroughNot stated; licence runs 6 weeksNot stated: we arrange it with the scaffolder
RBWMIts own boroughNot statedNot stated: ask who applies
Source: Hampshire County Council (read 28 October 2026); Surrey County Council; Wokingham Borough Council; Bracknell Forest Council; RBWM; Highways Act 1980 s169

A full re-roof needs scaffold on every side being worked on. Scaffold standing on a pavement or road needs the highway authority's licence, under section 169 of the Highways Act 1980. Inside your own boundary no licence is needed: Bracknell Forest Council and Wokingham Borough Council both say so for private land. The table shows which authority covers which council area.

Licence fees, as each council publishes them

For Rushmoor and Hart addresses the licence comes from Hampshire County Council, whose page says scaffolding firms have to apply for their customers and asks for ten clear working days from the application to the start. Hampshire County Council charges £211.90 for the first 2 weeks and £72 for each further 2-week period, and offers no extensions, so a fresh application is needed if a job runs on. Surrey County Council, the highway authority for Camberley, Frimley and Farnham until April 2027, charges £208 per 28-day period and asks for applications at least 10 working days ahead. Wokingham Borough Council also says scaffolding companies must apply for their customers, at £263 for the first 4 weeks and £163 for each 4 weeks after. Bracknell Forest Council's residential licence is £350, including a non-refundable £100 application fee, and covers 6 weeks.

The licence is in place before the scaffold goes up. For Surrey County Council, Bracknell Forest and RBWM addresses we arrange it with the scaffolder. Farnborough Airport safeguards the area around the aerodrome against temporary obstacles such as cranes and tall plant, so where a roof job needs a crane or a tall hoist we contact the airport's safeguarding team first. Our guide to scaffolding for a new roof covers access in more detail.

CDM and a tidy site

The Construction (Design and Management) Regulations 2015 apply to work on your home too. In HSE's terms you are a domestic client when building work is done on your own home, or a relative's, outside any business. A single contractor on the job must draw up a construction phase plan; two or more contractors means a principal designer and principal contractor must be named. Our plan is agreed before the scaffold goes up: where materials are stored, where the waste goes, how the drive stays usable, and what happens each day. Waste leaves the site as the work goes, not in one heap at the end, and neighbours on a shared drive hear from us before the scaffold arrives.

Notice to give

Ten clear daysHampshire County Council's minimum before a licence starts
10 working daysSurrey County Council: apply at least this far ahead
Source: Hampshire County Council; Surrey County Council

Older houses add one more check. HSE advises assuming asbestos is present in any building built or refurbished before 2000, and asbestos insulating board can turn up in external soffits, so the soffits on an older house are checked before they are cut or taken down.

Chapter 06 of 06

Contracts, neighbours and new-build cover

Consumer, party wall and new-build figures that bear on a re-roof

  • 14 daysto cancel a contract made away from the trader's premises
  • 3 quotesCitizens Advice suggests written quotes from at least three traders
  • 2 monthsparty wall notice before cutting away a chimney breast
  • 2 + 8 yearsNHBC Buildmark: builder warranty, then insurance cover
Source: Consumer Contracts Regulations 2013 and Party Wall etc. Act 1996, via legislation.gov.uk; Citizens Advice; NHBC Buildmark; accessed 28 October 2026

A new roof is a large contract, so the paperwork around it deserves the same care as the battens. The panel gathers the figures that apply to it.

Your rights when you sign at home

When the contract is agreed in your home after a survey, rather than at the trader's premises, it is an off-premises contract under the Consumer Contracts Regulations 2013. You can cancel it within 14 days of the day it is made, without giving a reason, and if you were not told about that right the period can stretch by up to 12 months. If you want work to begin inside the 14 days, ask for that on a durable medium, which in practice means in writing you can keep. The right falls away when you called the trader out yourself for urgent repairs, so a storm make-safe is handled differently from a planned re-roof.

Under the Consumer Rights Act 2015 the work must show reasonable care and skill. Citizens Advice recommends at least 3 written quotes before you choose, and its consumer helpline is 0808 223 1133. When you set quotes side by side, make sure each one states whether VAT and the scaffold are in the total, and that each names the same covering, underlay and ridge system, so the totals describe the same roof.

Party walls and new-build homes

On a semi or a terrace, a re-roof meets the neighbour's roof at the party wall. Where the work extends to the party wall itself, the Party Wall etc. Act 1996 may apply: cutting away a projecting chimney breast on a party wall is one of the rights the Act gives, and the neighbour must have at least two months' notice of it. Silence from next door is not consent, GOV.UK warns, and where you and the neighbour cannot settle a dispute a surveyor has to be appointed. Party wall questions go to a party wall surveyor, not to building control.

A recently built home may still be inside its new-home cover. NHBC's Buildmark gives a builder warranty and NHBC guarantee for two years after completion, then eight years of insurance cover against defects to certain parts of the home. If a new-build roof is leaking, check that cover before paying for a repair; our answer on roof defects on a new-build home sets out the steps.

What a new roof costs turns on its area and pitch, the covering chosen, the access and scaffold, any timber or chimney work the strip reveals, and the waste to be taken away. Wind and storm damage can bring the decision forward, but the same survey comes first either way. The price table on this page gives the national ranges.

Standards a new roof is built to

  • BS 5534:2014+A2:2018Slating and tiling code of practice
  • BS 8612:2018Dry ridge, hip and verge systems
  • BS 5250:2021Ventilating the roof space

Your roof, measured before it is priced

We lift a tile at the eaves, measure each slope and photograph the timbers, then give one written total after the survey.

Get a free quote

Typical UK prices for a new roof

Typical UK prices for a new roof
JobTypical UK range
Whole roof replaced on an average 3-bed house (Which?, ex VAT)£7,000 to £21,000
Three-bed semi, 65 m², plain concrete tiles, with labour, scaffold and insulation (HomeBuilding)£10,000 to £15,000
The same house in Welsh slate, might reach (HomeBuilding)£18,000
New roof, national average (MyJobQuote)around £5,250

Source: Which? cost guide (November 2025, prices ex VAT); HomeBuilding (September 2025); MyJobQuote (October 2026)

The guides differ widely, which is why three are shown. These are UK figures, never our own prices.

Before you replace a roof: guides and answers

Guides and short answers on cost, scaffolding, insulation, the re-roofing rule, reusing old tiles and each stage of the work.

Guide · 9 min read

Signs You Need a New Roof

One failure is a repair. A pattern of them, across several slopes and on an ageing roof, is…

How a roof replacement runs

  1. Whole-roof inspection and photos
  2. Your one written total
  3. Licence, scaffold and site plan
  4. Strip, rebuild and sign-off

Roof replacement questions, answered for Farnborough

What does a new roof cost on an average house?

National guides differ. Which? gives £7,000 to £21,000, ex VAT, to replace all of a typical 3-bed house's roof, HomeBuilding gives £10,000 to £15,000 for a 65 m² semi in concrete tiles, and MyJobQuote says around £5,250. Area, covering, access and what the strip reveals move a real price.

Are there grants that help with the cost of a new roof?

No national scheme pays for a new roof as such. ECO4 ends on 31 December 2026; the Warm Homes: Local Grant pays for insulation, usually for households on £36,000 a year or less; and Disabled Facilities Grants cover adaptations for disabled people. Rules differ by scheme, so confirm you qualify before counting on one.

When is the best time of year to replace a roof?

Any season can work, because the roof is stripped and re-covered a section at a time and sheeted overnight. Dry, mild spells make the work go faster and suit mortar bedding, while frost or heavy rain can pause a day here and there. Booking early gives more choice of start dates.

Can we stay at home while the roof is replaced?

Yes, normally. The roof is opened one section at a time and covered at the end of each day, so the house stays weathertight. Expect noise while the old covering comes off, dust in the loft and scaffold outside the windows. Clearing the loft beforehand helps, and we tell you what happens each day.

Do you replace roofs in Aldershot, Fleet, Frimley and Farnham too?

Yes. We work from Farnborough across Aldershot, Cove and North Camp, out to Fleet and Church Crookham in Hart, and over the border to Camberley, Frimley and Farnham in Surrey. Each council has its own scaffold licence and building control route, and we check both for your address.

How long does a replaced roof last?

That depends on the covering. HomeBuilding gives Welsh slate 100+ years, clay tile 60-80 years and concrete tile 40-50 years, while Marley expects around 60 for its concrete tiles. Renewing the battens, underlay, fixings and ventilation at the same time gives the new covering the best start it can have.

Get your free roof quote

Book a whole-roof survey

Tell us what you have seen, and we will survey every slope, the loft and the roofline.

01252 596302

10-year workmanship guarantee, in writing.

WhatsApp us